Works involved the full refurbishment of the entire mall on two floors, including five replacement escalators, new scenic lift, structural alterations to mall floor openings, new ceramic floors and screeds, mechanical service alterations for ceilings, formation of a new reconfigured food terrace and six new kiosks.