SCOPE OF WORK
The provision of additional trading floor space at the Kingston store involved repositioning escalators, infilling floor voids with steelwork and concrete, altering bronze balustrades, new suspended ceilings and floor tiling. Works also included the installation of new light fittings, fire alarms and ventilation systems. All works were carried out at night so as to maintain the normal daily trading of the store.
|